OCEANIABIZ.COM

Heighton Mezzanine Floor Builder Melbourne

Address 51 Assembly Dr, Tullamarine VIC, Australia
Phone +61 1800 278 672
Hours
Monday07:00-17:00
Tuesday07:00-17:00
Wednesday07:00-17:00
Thursday07:00-17:00
Friday07:00-17:00
Website www.heighton.com.au
Categories Construction Company, Building Firm, Office Refurbishment Service, Steel Construction Company, Steel Framework Contractor
Rating 5 36 reviews
Similar companies nearby
Indieco Homes — Unit 8A/1 Trade Park Dr, Tullamarine VIC
Hille’s Home Extensions — Level 1/50 Wingara Ave, Keilor East VIC
Allmore Constructions Pty Ltd. — 68 Barrie Rd, Tullamarine VIC
Perfection Restumping & Underpinning — Unit 14/53-55 Garden Dr, Tullamarine VIC

Heighton Mezzanine Floor Builder Melbourne reviews

36
Sort by: date highest rated lowest rated most helpful
Claire
04 August 2023 0:52

Heighton was extremely professional and provided a quality service from start to finish. They remained in constant contact with us along the way. The project was delivered within the time frame originally provided and we had no issues. We are very happy with the end result and would recommend them.

Eddy
05 July 2023 0:51

I am absolutely thrilled with the mezzanine built by the talented team at Heighton's. Their craftsmanship, design, and unwavering commitment to excellence have created a stunning addition to our warehouse. From the commencement of the project the team were proactive and responsive, anticipating our needs and constantly checking in to ensure all was going to plan. I highly recommend reaching out to this exceptional team who will not only meet but exceed your expectations. They have created a functional space that will enhance our operations for years.

Chbib
30 June 2022 20:50

We engaged them for building the mezzanine floor for our factory. They are very very professional in all aspects from correspondence to execution of job till completion. It is worth the charges given their professional level. We would strongly recommend this good company.

Chris
09 June 2022 9:08

Thanks to the team at Heighton for the quick turn around and quality install on the new mezzanine floor at MMEM (AWM Electrical) Sunbury. Leslie, Jason and his team made to process so easy and were a pleasure to work with.

Ian
08 June 2022 17:51

"Great well managed experience that was delivered professionally and on time", Not often you can say that these days but this is what you get with Heighton. Very happy with the finished product!

Grant
23 May 2022 3:45

Engaged to build a warehouse mezzanine for additional office space. Great experience from initial contact to completion of build. Professional friendly communication and always available when required. Highly recommended.

Ewen
23 May 2022 1:52

Heighton Mezzanine Floors were Professional, flexible, and fast. Excellent communication through out the process. Great value for money and diligent through out the planning and approval process.
We are very happy with the quality of the build and how the project was managed.
Highly recommended!

Andrew
21 May 2022 15:09

This is the 3rd time we have used the team from Heighton, they are fantastic to deal with. Even if a problem arises, they are great communicators and the on-site team went above and beyond to get hte job done on time.
Thanks again!

Arron
21 May 2022 12:56

Heighton offered an exceptional service, they delivered high quality work, went above and beyond to meet our requirements and deadlines, our Project Manager was very thorough while ensuring all of our expectations were met.
The area looks professionally finished with quality workmanship, the workplace was kept tidy at all times allowing us to continue our work, their staff showed great attention to detail, were very friendly and helpful with constant updated on their progress.
I would definitely be using these guys for any future works of ours.

Brett
06 May 2022 23:31

We recently engaged Heighton to design and construct a mezzanine floor for us. From the first point of contact, through to the finished product, they were a pleasure to deal with and they produced and excellent product. We will certainly us them again if we have the need.

Jeff
16 April 2022 21:25

Mezzanine Floor installed in Warehouse, Great Job, Very Professional, on time zero disruption to our business thanks to the Heighton Team

Josh
12 January 2022 14:38

Professional, efficient work. Very happy with the mezzanine, the blokes doing the installation didn't cut any corners and showed up on time every day. Workmanship was top notch

•BIGGIE•
24 December 2021 21:12

Great company to work with.
They were professional and fast.
The quality of the job came out better than expected.
Would highly recommend and would use again.

Steve
04 December 2021 1:44

Thanks to Leslie, Jason and the wider Heighton team for an excellent experience from Quotation through to completion. Very professional and efficient team, and the installation crew worked seamlessly in and around our daily requirements. Highly recommend.

Steve Tabone
Operations Director
Aluminium Industries

Tim
10 November 2021 4:12

Was contemplating a DIY mezzanine but very glad now I took Heighton's quote. Professional & quality job with a great team of installers. Great communication through the whole process & strongly recommend them.

Debbie
04 November 2021 16:38

Heighton built a mezzanine for our factory.
From start to finish the process was easy. The mezz up safely, sturdy and completed to timeline given. Seriously what more could you ask for? Would use again. The hardest part of the process was setting up a go-pro to take a time lapse video of the build!

user
04 November 2021 14:37

Great service from start to finish. From tender stage, through to design and installation Heighton delivered on all they promised. Great communication, quality work and quick installation was exactly what we had hoped to get and it was delivered in spades

Sally
18 October 2021 6:59

We were very impressed with Heighton's. From the planning stage all the way through to implementation. They were able to build our mezzanine and workshop rooms with minimal disruption to existing operations. The entire process was seamless. We are very happy with the final product.

bruno
05 October 2021 0:17

Heighton have been fantastic. The deadline to get our mezzanine training room and showroom ready for our first trainees sessions was more than tight and considering we were navigating in-between very uncertain times through the pandemic, I think this could not have been more challenging. They respected their commitment and have done an excellent job. Their customer service and the outcome is outstanding. I highly recommend Heighton and the team of trades they have chosen to accomplish the project.

Auscool
02 September 2021 1:09

Heighton were extremely responsive, well priced and delivered exactly what they promised and we were very happy with the whole stress-free process.

Add review